BIM work by Caston in Southern California
Capabilities

BIM

Coordination done before the crews get there.

Problems are cheapest on screen. That is where we find them.

Caston models its scope and participates in project coordination so clashes get resolved in the model rather than in the field.

Model-driven layout means framing goes in once, in the right place.

Coordinated framing and ceiling models on complex healthcare and institutional builds.

Scope

What Caston self-performs

  • Framing and ceiling scope modeling
  • Clash detection and coordination meetings
  • Model-based field layout and point export
  • Prefabrication support

Have a project that needs bim?

Talk to Caston