UCLA Southwest Campus Student Housing in Los Angeles, CA
Case Study

UCLA Southwest Campus Student Housing

Higher Education · Los Angeles, CA

Caston delivered design-build metal stud framing systems, scaffolding, lath and plaster, drywall, spray applied fireproofing, and insulation on UCLA's Southwest Campus Student Housing, constructed during the COVID-19 pandemic without losing any days on the schedule.

3 photos · Click any image to enlarge

Market
Higher Education
Location
Los Angeles, CA
Delivery
Design-build framing systems
Scopes
Six under one contract
Conditions
COVID-19 pandemic construction
Schedule
No days lost

Built through a pandemic. Without losing a day.

The project was constructed during the COVID-19 pandemic, which brought unique challenges to staffing, logistics, and sequencing, and the schedule could not slip.

The scope combined design-build metal stud framing systems with plaster, drywall, fireproofing, and insulation: a multi-discipline package with tight logistics and high-end finishes.

How Caston Built It

The approach that kept the date

  • Design-build framing

    Caston engineered the metal stud framing systems under design-build delivery, resolving the structure behind the walls before crews arrived.

  • Six scopes, one contract

    Framing, scaffolding, plaster, drywall, fireproofing, and insulation ran through a single accountable team.

  • Pandemic-proofed logistics

    Staffing, deliveries, and sequencing were actively managed through COVID-19 conditions so the schedule never lost a day.

  • High-end finishes held

    Tight logistics did not lower the bar: plaster and finish work carried the standard the campus expected.

Scope Self-Performed

  • Design-build metal stud framing systems
  • Scaffolding
  • Lath and plaster
  • Drywall
  • Spray applied fireproofing
  • Insulation

Outcome

0

Days lost on the schedule during the pandemic

6

Scopes self-performed under one contract

Design-build

Metal stud framing systems

High-end

Finishes delivered despite tight logistics