Ruhnau Clarke Architects in Southern California
Case Study

Ruhnau Clarke Architects

Interiors · Southern California

Caston served as general contractor on the Ruhnau Clarke Architects office and self-performed drywall, metal stud framing, sandblasting, paint, ceramic tiling, reclaimed wood flooring, and demolition, delivered over five phases while the office remained fully operational.

8 photos · Click any image to enlarge

Market
Interiors / Historic Renovations
Location
Southern California
Role
General contractor
Phases
Five
Status
Office fully operational throughout
Discovery
90-year-old hand-painted advertisements

Caston as general contractor, in an office that never closed.

The office remained fully operational through the entire renovation, which meant the work was delivered over five carefully sequenced phases around the people working in it.

The finish scope was high-end and custom, including delicate sandblasting of existing brick walls to reveal hand-painted advertisements dating back 90 years.

How Caston Built It

The approach that kept the date

  • General contractor and craftsman

    Caston was the general contractor and self-performed drywall, framing, sandblasting, paint, ceramic tiling, reclaimed wood flooring, and demolition.

  • Revealing 90 years of history

    Existing brick walls were delicately sandblasted to reveal hand-painted advertisements dating back 90 years, custom finish work at its most careful.

  • Five phases, zero closure

    The renovation was phased five ways so the office stayed fully operational from start to finish.

  • High-end custom finishes

    Reclaimed wood flooring, ceramic tiling, and custom paint were executed to the standard an architecture firm's own office demands.

Scope Self-Performed

  • General contracting
  • Drywall
  • Metal stud framing
  • Sandblasting
  • Paint
  • Ceramic tiling
  • Reclaimed wood flooring
  • Demolition

Outcome

GC

Caston as general contractor

90 yrs

Hand-painted advertisements revealed by careful sandblasting

5

Phases in a fully operational office

7

Scopes self-performed

Have a project with a date that cannot move?

Talk to Caston