Ontario Stadium in Ontario, CA
Case Study

Ontario Stadium

Civic · Ontario, CA

Caston self-performed eleven scopes on Ontario Stadium, including design-build metal stud framing and a themed bat wall, on an extremely tight schedule that was finished early.

18 photos · Click any image to enlarge

Market
Civic
Location
Ontario, CA
Delivery
Design-build framing
Scopes
Eleven under one contract
Feature
Themed bat wall
Schedule
Extremely tight, finished early

An extremely tight schedule, finished early.

The project carried an extremely tight deadline, and the scope ran from design-build framing through themed elements, FRP, and air barriers.

A themed bat wall and high finish expectations left no room for the delays that multi-contractor handoffs usually create.

How Caston Built It

The approach that kept the date

  • Design-build framing

    Caston engineered the metal stud framing under design-build delivery, keeping design decisions inside the schedule.

  • Themed work in house

    The themed bat wall was self-performed by the same crews carrying the plaster scope.

  • Eleven scopes, one team

    Framing, fireproofing, carpentry, plaster, FRP, insulation, themed work, BIM, scaffolding, drywall, and air barriers ran through Caston.

  • Model-coordinated

    BIM coordination kept the multi-scope package clash-free ahead of the field.

Scope Self-Performed

  • Design-build metal stud framing
  • Spray applied fireproofing
  • Rough carpentry
  • Lath and plaster
  • FRP
  • Insulation
  • Themed bat wall
  • BIM
  • Scaffolding
  • Drywall
  • Air barriers

Outcome

Early

Completion on an extremely tight schedule

Design-build

Metal stud framing

Themed

Bat wall self-performed

11

Scopes under one contract

Have a project with a date that cannot move?